Documentation
  • Onboarding
  • Getting Started
    • Get Started
  • Platform
    • Company
      • Company Account and Dashboard
      • Apps Management (Licenses, Keys, and User Roles)
      • Store
      • Company Profile
      • Upload Company Logo
      • Billing (Subscriptions, Invoices,and credit card info)
    • Account
      • Remember Me
      • Can I use Petrobench for free?
      • I provided a company, but I don’t see it in my organizations.
      • Forgot your password?
      • Get access to a Company?
      • I received a Voucher. Where do I enter the code?
      • Quick Start
      • Quick Search
      • User Profile Dashboard
      • Profile
      • User Dropdown
      • Organizations
      • View My Profile
      • Upload profile picture
      • How to change my Current Organization
      • User Overview
      • User Apps Overview
    • Variables
      • Rod Data
      • Tubing Data
      • Simulation Preferences
      • Well Data
  • Apps
    • RodSim
      • Creating and running a simulation
      • IPR Data
      • Tubing Data
      • Simulation Preferences
      • Well Data
    • Calculators
      • Flow Regime Calculator
      • Foam Column Density Calculator
      • Tubing Tension Calculator
      • Hydraulic Lift Calculator
      • Predictive IPR Calculator
      • Pump Slippage Calculator
      • Stroke Rate Calculator
      • Rod Pump Production Calculator
      • Sheave Size Calculator
    • Well Management
      • Remove a well from "My Wells" list
      • Adding a well to MyWells
      • Filter Wells
Powered by GitBook
On this page

Was this helpful?

  1. Apps
  2. RodSim

IPR Data

IPR Data can be used in simulation preferences to provide a pump intake pressure associated with a target production value.

Calculation Method

This is information only, the calculation method used is the Vogel IPR

Static Bottom Hole Pressure

Stabilized bottom hole pressure of the shut in well

Bubble Point Pressure

The pressure at which the first bubble of gas comes out of solution at reservoir temperature

BHFP

The bottom hole pressure observed at given oil, water and gas flow rates

Oil (BPD)

Daily oil production in barrels per day

Water (BPD)

Daily Water production in barrels per day

Gas (mscf/day)

Daily gas production in thousand standard cubic feet per day

Fluid (BPD)

Daily combined oil and water production in barrels per day

Water Cut

Water production as a percentage of fluid production

Max Oil

Estimated daily oil production at a bottom hole flowing pressure of 0 psi

Max Water

Estimated daily water production at a bottom hole flowing pressure of 0 psi

Max Gas

Estimated daily gas production at a bottom hole flowing pressure of 0 psi

Max Water Cut

Estimated water cut at a bottom hole flowing pressure of 0 psi

PreviousCreating and running a simulationNextTubing Data

Last updated 1 year ago

Was this helpful?